Custom Home Builders in the Lower Mainland, Vancouver Island and Lake Country.
Family-run custom home builders for the Lower Mainland and Vancouver Island. We take on a small number of homes each year so a Binning is on every site, every week — and signs off on every detail.
HPO Licence #43347 · Pacific Home Warranty 2-5-10 · 10+ years building · Lower Mainland · Vancouver Island
Why Families Choose Binning
A family business, in the literal sense.
Binning & Sons was started by Harj Binning, and his sons who work in the business alongside him. There is no franchise, no head office somewhere else, no rotating project manager you've never met. When you hire Binning, you hire a family that signs its name to every home — and that's the way we want it.
The "& Sons" on the door is a commitment, not a nostalgia piece. It means the same people who quoted your home are the ones on site when the foundation is poured, when the millwork goes in, and on the day you get your keys.
A small number of homes a year.
We deliberately take on a limited number of custom builds each year. Not because demand is small — but because attention is finite. The trade-off is honest: fewer homes, more attention. One of us is on every site, every week. Decisions don't sit in someone's inbox. Issues don't compound while a busy supervisor is on three other jobs.
If you want a builder who treats your home like one of fifty active files, we aren't it. If you want a builder who treats your home like one of a handful, we'd like to hear from you.
Every project or single family home I have ever built: The one question I always ask myself once it is completed: “WOULD I LIVE IN THIS HOUSE?”. and the answer honestly was always YES.
Mainland-to-Island reach. One point of accountability.
Most Lower Mainland custom builders stop at the strait. Most Island builders don't cross it. We do both - and we built the team and processes to do it well. Our active builds run from South Surrey, White Rock and New Westminster on the Mainland through Victoria and Port Alberni and across the wider Vancouver Island. Same standards, same warranty, same family - wherever your lot is. We have a long family history on Vancouver Island, and our experienced team is equally at home building here and on the mainland.
Our Newest Custom Home Build Projects
Howe — New Westminster 6 bed · 6 bath · open-concept contemporary, two living rooms, high-end appliances and millwork. [View project →]
Song Sparrow Way Nanaimo, BC - 4 plex Nanaimo, BC. 3 bedrooms plus flex room, LG professional series appliances, custom showers, engineered floors for modern living [View project →]
Ready To Get Your Project Started?
How A Binning Custom Home Gets Built
Every Binning home moves through five phases. We tell you up front what each phase costs, what we'll do, what you'll do, and roughly how long it takes — so the journey from raw lot to keys-in-hand never feels like a black box.
1. Discovery & feasibility · 4–6 weeks
We come and see the lot. We sit down with you and your family. We talk about the home you actually want to live in — not the one a brochure says you should — and the budget that's realistic for the brief and the location. We review zoning, BC's small-scale multi-unit rules (Bill 44), and any heritage, slope or arborist factors that affect what's possible.
You receive: a written feasibility memo and a ballpark range to make a decision.
2. Design & engineering · 2-4 weeks
We engage your architect (or one of our design partners), structural and mechanical engineers, and an energy modeller for BC Energy Step Code compliance. Drawings move from concept to permit-ready in stages, with you reviewing at each one.
You receive: permit-ready drawings and a line-item construction budget — not a single number, the actual breakdown.
3. Permits & pre-construction · 2–4 months
We submit to the City of Surrey (or your local authority), navigate Zero Carbon Step Code requirements, and lock in trade availability. We also choose the right contract structure for your project — fixed price or cost-plus — and walk you through the implications of each.
You receive: building permit and a signed contract you understand line by line.
4. Construction · 8–14 months typical (longer for >5,000 sq ft)
We break ground. You get weekly written site reports with photos, fortnightly walk-throughs on site, and a transparent draw schedule against the line-item budget. The mid-construction blower-door test is built into the schedule, not bolted on.
You receive: a completed home, third-party tested and ready for occupancy.
5. Handover & 2-5-10 warranty · ongoing
Final walk-through, deficiency list, occupancy. Then the relationship continues. Pacific Home Warranty's 2-5-10 covers materials and labour for 2 years, the building envelope for 5, and structural integrity for 10. We service the warranty ourselves — you don't get a phone tree.
Ready To Get Your Project Started?
What's Included In Every Binning Home
We don't believe in surprise line items. Every Binning custom home — whatever the budget — includes the following as standard:
A named Binning principal as your point of contact for the entire build. Get fast, often same-day, answerts to your questions
Weekly written site reports with photographs
Fortnightly on-site client walk-throughs
Transparent line-item budget with draw schedule
BC Energy Step Code compliance and energy modelling
Mid-construction blower-door air-tightness testing, and a final air tight blower test by the energy advisor so the home meets BC Code standards. My homes tend to be above and beyond the basics required by bc code.
Pacific Home Warranty 2-5-10 enrolment and registration
Post-occupancy concierge through the full warranty period
What we'll quote separately and transparently
These items vary too much by lot and brief to bundle, so we cost them line by line and explain the assumptions:
Architectural design (yours or via one of our design partners)
Geotechnical investigation and arborist reporting
Structural, Civil, Mechanical, Environment, storm water management engineers. I work with everyone of them as required for each unique property.
Landscaping and hardscaping above a baseline package
Smart home automation above a standard Crestron / Control4 package
Pool, spa, sauna, cold plunge and dedicated wellness rooms
Secondary suite, coach house or Bill 44 multi-unit additions
You'll see every one of these as its own line in the construction budget — never absorbed, never margin-padded.
What A Binning Custom Home Costs
Every Binning home is bespoke. We don't publish a per-square-foot rate because no two of our homes share the same lot, the same scope or the same finish package. Recent Binning builds have ranged from premium custom homes through to estate projects in the multi-millions — driven by the brief, not by a price list.
What we can tell you, transparently, is exactly what drives the number for your home.
Lot, slope and ground conditions. Geotechnical, arborist, retaining and drainage requirements differ enormously between flat South Surrey lots and view properties in West Vancouver or hillside builds on the Island.
Finish level. Millwork, stone, tile, joinery, appliances, lighting, audio-visual — this is where the range from "premium" to "no-expense-spared" mostly lives.
Square footage and structural complexity. Span, cantilever, wall heights, basement and roof geometry — all of it moves the number.
BC Energy Step Code performance target. Step 3 is the floor; Step 5 (effectively Passive House performance) costs more up front and pays back over the life of the home.
Architectural design and engineering scope. Whether you're bringing your own architect or engaging one of our design partners, and how detailed the drawing package is.
Landscaping, pool, suites, automation. Anything outside the four walls or above a baseline tech package gets quoted as its own line.
On timeline: plan for 12–24 months from discovery through to keys, including design, permits and construction. Larger or more complex homes sit at the longer end of that window. We'll commit to a real schedule once we've seen the lot and the brief.
Areas We Serve
Binning works actively on both sides of the Strait of Georgia. Most Lower Mainland custom builders don't take Island work. Most Island builders don't cross over. We built the team and the processes to do both well, and we keep the same family, the same warranty and the same standards across every project — wherever the lot is.
Lower Mainland
South Surrey · Morgan Creek · Crescent Beach · Ocean Park · Sunnyside · Grandview Heights · Elgin Chantrell · White Rock · Cloverdale · Langley · New Westminster · Burnaby
Vancouver Island
Victoria · Saanich · Oak Bay · Sidney · Cowichan Valley · Nanaimo · Parksville · Qualicum Beach · Port Alberni · Comox Valley · Tofino & Ucluelet
If your lot is somewhere we haven't named here, we're still happy to talk — most of our work comes from referrals and the map keeps growing.
Built For BC's Climate, Codes And Lots
You shouldn't have to become an expert in building science to hire a builder. But you should know that your builder is. Here's the regulatory and performance landscape in BC right now, and how a Binning home is designed to meet it.
BC Energy Step Code
Every new home in BC must hit at least Step 3 of the BC Energy Step Code — that's been the provincial floor since January 2023. The Code steps up over the next several years, with Step 5 (effectively Passive House performance) becoming mandatory province-wide by 2032. We design every Binning home to meet today's code comfortably and to be future-proofed against the next step. Where clients want to leap ahead — Step 5, Net Zero Ready, or full Passive House certification — we'll model and price both options so you can choose with eyes open.
BC Building Code 2024
The 2024 code update — including the cooling provision (every dwelling must include at least one living space designed not to exceed 26 °C), reinforced bath walls for future grab bars, and new earthquake-design requirements — is part of how we draw and build, not an afterthought.
Zero Carbon Step Code
Since March 2025, every new home in BC must meet at least EL-1 (Measure-Only) of the Zero Carbon Step Code, and Surrey has adopted EL-1 in its building bylaw. In practice that means a heat-pump-ready, all-electric strategy is now standard on every Binning home, with mid-construction blower-door testing built into the schedule.
Bill 44: small-scale multi-unit housing
Bill 44 changed what's permitted on a traditional single-family lot across BC, with Surrey's bylaw amendments live since July 2024. On many Surrey lots you can now build three or four units by right (up to six in Frequent Bus Stop Areas). If your project is genuinely a single custom family home, this won't change much. If you're considering a coach house, secondary suite, or a duplex/triplex on the same lot, it changes a lot — and we'll walk you through what it means for your specific address.
Get in Touch
Whether you have a question, an idea, or just want to say hello, feel free to reach out—we’re here to help.
Frequently Asked Questions
-
Every Binning home is bespoke, so we don't publish a per-square-foot rate — anchoring on a single number tends to mislead in either direction. What we can tell you: recent Binning builds have ranged from premium custom homes through to estate projects in the multi-millions. The number for your home depends on the lot, square footage, design complexity, finish level, Step Code performance target, and whether you're adding a pool, suite, coach house or significant landscaping. After a discovery meeting we'll come back with a written cost framing for your specific project.
-
For anything under 5,000 sq foot, plan for 12–24 months from the day you get permits to the day you get your keys. Roughly: 4–6 weeks of discovery and feasibility, 3–5 months of design and engineering, 2–4 months of permits and pre-construction, and 8–14 months of construction (longer for homes over 5,000 sq ft). Surrey's published target for a single-family permit is around 10 weeks, though actual times vary — we plan around realistic windows, not best-case ones.
-
A general contractor coordinates trades on a project that has already been designed and specified by someone else. A custom home builder takes responsibility from raw lot to handover — including design coordination, engineering, energy modelling, permitting, the build itself, and the warranty afterwards. With a custom builder, one party is accountable for the home from start to finish. With a GC-only model, the homeowner usually carries the integration risk between architect, engineer and builder.
-
Yes — by law, anyone building a new home for sale in BC must be a Licensed Residential Builder under BC Housing's Homeowner Protection Office. Binning is licensed under HPO Licence #43347, which also means Pacific Home Warranty 2-5-10 coverage is enrolled on every home we build. You can verify any BC builder's licence on the BC Housing Licensed Builder Registry.
-
A new single-family home in Surrey requires a building permit at minimum, plus development and demolition permits where applicable. Depending on your lot you may also need arborist, geotechnical, environmental and BC Energy Step Code submissions. Heritage zones, hillside areas and waterfront lots add further review steps. We handle the entire permit process for you and submit on your behalf — but we'll explain every fee and every approval as it comes up.
-
The BC Energy Step Code is the province's performance-based path to net-zero-energy-ready buildings. Every new BC home must currently hit at least Step 3 — measured by air-tightness, energy modelling and a mid-construction blower-door test — and the floor steps up to Step 5 (Passive House performance) province-wide by 2032. In practice it means more insulation, better windows, careful air-sealing, and a heat-pump-ready electrical strategy. Done well, it costs a little more up front and saves money for the life of the home.
-
The quote will include all pricing which includes what the customer wants in their homes. Weather, Acts of God, Delays by city hall is beyond the control of the Home builder. Included will be all designs, engineer firms fees, city hall permit fees, supplies and labor costs.
-
Yes — and we do, regularly. Recent Island builds include homes in Victoria, Nanaimo and Port Alberni, with active and upcoming work elsewhere on the Island. We use the same family, the same warranty and the same standards on both sides of the Strait. Most Lower Mainland custom builders don't take Island work. We built the team and processes to do both well.
-
Either path works. Many of our clients arrive with their own architect and a design they love — we're happy to be the builder of record on a project that's already been designed. Others prefer a true design-build relationship. Binning and Sons have dedicated home designers and Architects inhouse. You can choose your own or you can work with our team. The cost will always be lower when you choose the architect or designer with Binning and Sons. Regardless, whichever route you take, the same Binning principal stays on the project from the first meeting onwards.
-
Often, yes. Bill 44 (small-scale multi-unit housing) and Surrey's July 2024 zoning amendments mean three to four units are permitted by right on many traditional single-family lots — up to six on lots within a Frequent Bus Stop Area. The right answer for your address depends on lot size, frontage, servicing and the rest of your project brief. We'll review your specific lot at the discovery stage and tell you what's actually permitted.
-
A short list we'd genuinely want a client to ask any builder, including us:
What's your BC Housing Licensed Residential Builder number, and how long have you held it?
Are you enrolled with a 2-5-10 home warranty provider?
Who specifically will be on my site, and how often?
Can I see a line-item construction budget for a recent build similar to mine?
What's your process when a cost overrun looks likely — at what point do I find out?
How many active builds do you carry at once?
Can I speak to two clients whose homes you've handed over in the last 12 months?
-
Usually no more than 5-7 custom hom builds per year. The arithmetic of a family business that puts a principal on every site, every week, doesn't allow for fifty active builds at a time. It means we sometimes have a waitlist; it also means your home gets the attention it deserves.
-
Two years on materials and labour. Five years on the building envelope (water penetration). Ten years on structural defects. It's BC's mandatory new-home warranty standard, and we enrol every Binning custom home with Pacific Home Warranty automatically. We service the warranty ourselves — calls go to a Binning, not a phone tree.
Simplest answer: 2 years: what the eyes can see (paint, nail pops, minor cracks in the wall) 5 years (inside the walls ie plumbing or electrical? 10 is structural ie: foundations the structure itself.
Ready To Get Your Started?